Faber Headquarders de GEZA Gri e Zucchi Architettura | Edificio de Oficinas

Fotógrafo: Massimo Crivellari

Faber Headquarders de GEZA Gri e Zucchi Architettura | Edificio de Oficinas ×
Faber Headquarders de GEZA Gri e Zucchi Architettura | Edificio de Oficinas

Fotógrafo: Massimo Crivellari

Faber Headquarders de GEZA Gri e Zucchi Architettura | Edificio de Oficinas ×
Faber Headquarders de GEZA Gri e Zucchi Architettura | Edificio de Oficinas

Fotógrafo: Massimo Crivellari

Faber Headquarders de GEZA Gri e Zucchi Architettura | Edificio de Oficinas ×

Two Landscapes
Faber Industrie Spa are world leading manufacturers of steel cylinders.
Their new headquarters are located at a boundary between an industrial area and farmland, and hence belong to both the industrial and the natural landscape. The aim of the project is to interface both landscapes and acknowledge their different qualities and values.

Two Volumes
The volume of the building is designed to “bring the two landscapes inside”, and integrate them in the new spaces. The building consists of two shifted longitudinal volumes linked by an entrance hall.

Two Open Courtyards
As a result, two “internal” open spaces are created, and controlled by views over the building and over the two landscapes. The designers here worked to obtain a reduced scale, i.e. the human scale, as opposed to the large-scale industrial area. While one courtyard is “hard”, lined with trees and conceived as a living area, the other courtyard is “soft”, entirely green and free, with an open visual depth eastwards, facing the manufacturing facilities and the mountains towards the Slovenian border.

The Section and Head Fronts
The notion of “double” is mirrored in the section, that is two “S” shapes. The corridor/office plan is inverted on the two levels: one totally blind side and one totally open side are overlapped, giving way to radically shifting open/closed fronts. The eastern head fronts of the office bodies actually highlight the S-section, while the western head fronts, where fire-exit stairs are accommodated inside wall panels, are closed and silent.

Two Materials
The notion of “double” permeates the whole design process, including the façade design.
The building is covered in a ventilated “skin” made of two materials, i.e. black concrete and black glass.
The prefabricated concrete walls and the glazed front cells alike are horizontal, 4 metres wide and 70 centimetres high. All elements are connected with the same method, i.e. 20 millimetres wide open joints. This gap element governs all installations of the front parts, groundline and skyline, horizontal and vertical separations, change in materials, and corner solutions. The black skin of Faber building is a product of the designers’ research on abstraction. Although the building is about 100 metres long, it looks “small” as compared to other huge industrial plants. Thanks to the subtle nuances created by four different types of glass and five different types of concrete, the building maintains the rigorous shape and layout of an industrial facility. Then, it will not stand out from the context because of its shape, but only because of the lightness generated by one colour getting degraded as it relates with the surrounding grass, tarmac, manufacturing plants, the sky and the people.
Black concrete is also the main feature of the most important area inside the building: the entrance hall has a large black-on-black terrazzo floor, a “liquid” element helping mirror and connect the two green courtyards together.

Functional Specifications
The new headquarters cover an area of about 2,800 square metres above the ground, and of about 1,400 square metres underground. They consist of two longitudinal volumes, oriented east to west, with an overall width of 7.80 metres, and different heights and lengths. The two blocks merge through a central volume serving as hall/reception, waiting area and functional connection of all areas.
All open spaces are lined with hedgerows of black poplars, which serve as standing “landmarks” to match the front wall panels. The hedgerow contour alternatively moves towards the inner or outer boundary of the area to hide the car park or highlight the perspective views.

Faber Headquarters
Established in 1972, Faber Industrie has grown rapidly to become the leader in the production of seamless steel and composite cylinders for the storage of high-pressure gases. All over the world Faber has earned the best reputation for its high standards of quality and for its capability to comply with the most stringent specifications set down by International Bodies, Local Authorities and its customers. A complete range of cylinders, from 1 to 259 litres water capacity, four modern factories, a competent, fully trained workforce with a devotion to quality and flexibility, has made Faber a true global supplier of high-pressure cylinders throughout the five continents. The four factories in the North East Italy, with a total floor space of 70.000 m2 , manufacture more than 900.000 cylinders per annum. Coupled with its high production capacity with built in quality, Faber is viewed as the industry leader in the supply of high-pressure cylinders.

Faber Industrie spa

Project: GEZA Gri e Zucchi Architetti Associati, Stefano Gri, Piero Zucchi

Team: Stefania Anzil, Chiara Marchetti, Tania Teixeira, Francesco Casella, Tina Carletti

Structural Engineer: Nuttassociati, Udine, Italy
Facade Engineer: Ing. Angelo Peruzza
Mechanical Engineer: Bulfon Associati, Udine
Electrical Engineer: Studio Venica, Udine
MEP consultant: HT Engineering, Udine
Site supervisor: GEZA Gri e Zucchi Architetti Associati – Stefano Gri, Piero Zucchi
Contractor: Edildri Costruzioni
Mechanical Systems: Elettrica Ducale
Electrical Systems: Tecnoimpianti/Nonino
Millworks: Arredi Ermacora
Office Furniture: Multitema

Faber Headquarders de GEZA Gri e Zucchi Architettura | Edificio de Oficinas

Fotógrafo: Massimo Crivellari

Faber Headquarders de GEZA Gri e Zucchi Architettura | Edificio de Oficinas ×
Faber Headquarders de GEZA Gri e Zucchi Architettura | Edificio de Oficinas

Fotógrafo: Massimo Crivellari

Faber Headquarders de GEZA Gri e Zucchi Architettura | Edificio de Oficinas ×
Faber Headquarders de GEZA Gri e Zucchi Architettura | Edificio de Oficinas

Fotógrafo: Massimo Crivellari

Faber Headquarders de GEZA Gri e Zucchi Architettura | Edificio de Oficinas ×
Faber Headquarders de GEZA Gri e Zucchi Architettura | Edificio de Oficinas

Fotógrafo: Massimo Crivellari

Faber Headquarders de GEZA Gri e Zucchi Architettura | Edificio de Oficinas ×
Faber Headquarders de GEZA Gri e Zucchi Architettura | Edificio de Oficinas

Fotógrafo: Massimo Crivellari

Faber Headquarders de GEZA Gri e Zucchi Architettura | Edificio de Oficinas ×
Faber Headquarders de GEZA Gri e Zucchi Architettura | Edificio de Oficinas

Fotógrafo: Massimo Crivellari

Faber Headquarders de GEZA Gri e Zucchi Architettura | Edificio de Oficinas ×